SEPTEMBER 2011 - Phase I of excavation for the reservoir site was completed on schedule. |
|
|
|
|
|
|
|
|
|
|
Dirt work is completed on the slope adjacent to the tank site. Soon this will be hydroseeded to initiate growth of groundcover for erosion control. |
|
|
|
|
|
|
|
|
|
|
|
|
Crews set up jack-and-bore equipment to install inlet and outlet pipe through the hillside. |
|
|
|
|
|
|
|
|
|
|
|
|
A section of the auger unit is visible inside the 30" pipe casing. Augers are used to remove soil from the 400-foot bore tunnel. |
|
|
|
|
|
|
|
|